01869 320 320 sales@morleys.co.uk

CASE STUDY:

Tormead School

Location: Guildford, Surrey |  Institution: Independent School
Student Number: 850 (ages 4-18)

Installation Date: July/August 2025
Duration Onsite: 7 weeks

Project Value: £450K

Morleys was proud to be appointed as FF&E specialist for this full turnkey project, delivering the design and supply of furniture alongside specialist fit-out services to support the complete transformation of the Chemistry laboratories and English classrooms
at Tormead School.

It was a privilege to be invited back following the successful completion of a previous project in summer 2024, during which Morleys refurbished learning environments for the Maths and Modern Languages faculties, as well as the Design Technology room. That earlier project included the development of design concepts, the supply of loose and fitted furniture, bespoke teacher walls, and specialist draftsman tables.

Case Study:

Tormead School

Location: Guildford, Surry

Institution: Independent Girls School 

Student Number: 850 (ages 4-18)

Installation Date: July/August 2025

Duration Onsite: 7 weeks

Project Value: £450K

 

Morleys was proud to be appointed as FF&E specialist for this full turnkey project, delivering the design and supply of furniture alongside specialist fit-out services to support the complete transformation of the Chemistry laboratories and English classrooms
at Tormead School.

It was a privilege to be invited back following the successful completion of a previous project in summer 2024, during which Morleys refurbished learning environments for the Maths and Modern Languages faculties, as well as the Design Technology room. That earlier project included the development of design concepts, the supply of loose and fitted furniture, bespoke teacher walls, and specialist draftsman tables.

PROJECT SCOPE

Founded in 1905, Tormead School places strong emphasis on personal
development, academic excellence, and a broad curriculum. Alongside rigorous classroom learning, the school offers a wide range of co-curricular activities and
actively promotes individuality, resilience, teamwork, and confidence, preparing pupils for further education and life beyond school.

For this project, Morleys delivered a full turnkey refurbishment of two Chemistry laboratories, transforming them into modern, safe, and fully compliant teaching spaces. The Chemistry preparation room was also fully redesigned and refurbished to address long-standing challenges, including insufficient storage, an undersized sink area, and a fume cupboard that was no longer fit for purpose.

In addition, the English classrooms were in need of renewal, with tired interiors
and mismatched furniture that lacked cohesion and inspiration.

The scope of works included full strip-out, new fitted furniture, upgraded mechanical and electrical services, new fume cupboards, integrated teaching technology,
and coordinated FF&E throughout.

HOW WE DELIVERED

The refurbished Chemistry laboratories now provide future-ready, high-quality environments that support practical learning and modern science education. The design moved away from dark, traditional finishes in favour of a light, contemporary aesthetic, creating an inviting and aspirational space that encourages students to pursue A-Level Chemistry.

Previously, each laboratory featured a separate teacher’s bench that restricted circulation and limited flexibility. Morleys redesigned the layout by integrating the teacher’s bench into a student bench, subtly raising it to maintain clear sightlines for demonstrations while preserving a clear distinction between teaching and student work areas.

The laboratories remained connected to the school’s legacy heating system, resulting in poor temperature control, particularly due to extensive glazing along one elevation.
To resolve this, Morleys decommissioned the existing radiators and installed new ceiling-mounted dual air-conditioning units in both laboratories, ensuring a comfortable, well-regulated environment throughout the year. Lighting was also comprehensively upgraded, eliminating previously dark areas and delivering consistent, high-quality illumination across the spaces.

By reconfiguring the layout and functionality of the Chemistry preparation room, Morleys more than doubled the available storage while significantly improving usability, safety and workflow.

The English classrooms were transformed through the replacement of outdated, mismatched furniture with a modern, coordinated fit-out. New furniture, integrated teaching walls, a matching locker system and upgraded overhead LED lighting were introduced to create calm, contemporary learning environments that support focus
and engagement.

Specialist Services We Provided

For the Science Labs:

• Heating and cooling systems

• Fume cupboards and extract systems

• Power distribution and lighting

• Emergency power and isolation systems

• Data and IT cabling

• AV and teaching technology

• Plumbing

• Water supply and drainage

• Laboratory gas services

• Emergency shut-off valves

• Eye wash stations and safety showers

• Acid-resistant waste systems

• Ceiling tiles and repaired grid system

• Full redecoration

• New nonslip vinyl floor to comply
   with H&S standards

• All new LED lighting on 3 gang distribution

• New distribution boards

For the English Classrooms:

• Full painting and decorating

• Repairs to plaster work

• New LED lighting

• New data cables

• New carpet tiles

Key Products:

• Fully fitted bespoke bench units
    and fitted teaching walls

Contact Us

Speak to one of our expert furniture consultants today to discuss how we can help transform your space.

1 + 8 =

Brand Name
Brand Name
Brand Name
Brand Name
Brand Name
Brand Name
Brand Name
Brand Name
Brand Name